info@beaconmarineco.com   |   Pay Your Bill

rip rap

Helical Pile Installation Brewster

LOCATION: Brewster, Cape Cod, MA

PROJECT COMPLETION: April 2017

DESCRIPTION: Beacon Marine Construction was hired to install a helical pile foundation system to support an addition extending off the main floor of a house on a sloped lot. The helical piles were installed in a tight space among fragile landscape. Beacon is a certified installer of the AB Chance pile systems.

Pirates Cove Boat Ramp – Float and Pier Construction Mashpee, Cape Cod

LOCATION: Mashpee, Cape Cod, MA

PROJECT COMPLETION: October, 2016

DESCRIPTION: Beacon Marine Construction was hired to install and new pile supported aluminum float, aluminum gangway, and wooden pier section at the Pirates Cove Boat Ramp in Mashpee, MA. Beacon was able to successfully complete the work within the specified timeline. The boat ramp remained open throughout construction. When finished the public had a stable platform to use while launching and hauling their boats at this busy ramp.

Beach Nourishment, Cotuit

Location: Little Island, Osterville, MA

Completion date: June 2016

Details: Beacon Marine was hired to deliver 70 cubic yards of sand in an effort to nourish a beach that had experienced erosion at the base of a stone revetment. This project required the use of Beacon’s crane barge, materials barge, and tugs to deliver and place the sand via water.