info@beaconmarineco.com   |   Pay Your Bill

Osterville – Pier Replacement

LOCATION: Osterville

COMPLETION DATE: June 2023

PROJECT DESCRIPTION: Our construction crews completed this job by removing the homeowner’s old pier, and replaced it with a brand-new pier, as well a large floating dock. This new pier and floating dock were constructed with IPE decking, which will give the homeowner a heavy duty and long-lasting deck surface. This dock is unique in that it can accommodate multiple large boats with plenty of draft and berthing space.

PROGRESS:

COMPLETITION: