PROJECT DESCRIPTION: To complete this project, it required dredging to create depth for the floating dock. This was done with a piece of small-scale equipment, which gave our crews the ability to work in a shallow environment. This process included the dredge material to be loaded into one-yard bags and offloaded by Allen Harbor Marine’s forklift, and then loaded into a dump truck. The dock was built with IPE decking. The homeowner chose to apply a clear stain to bring out the beauty of the wood and it looks amazing.