Location: Martha’s Vineyard, MA
Project Completion: February 2018
Details: Beacon Marine Construction was hired by a contractor to travel to Martha’s Vineyard and install helical piers at a new custom home. 11 helical piers were driven to a 20 kip minimum rating as deep foundation supports for various structures of the new house. Our drive head communicates with a remote display in the operators cab which gives a live readout to the operator while installing. Furthermore, it saves and stores the driving data and creates individual logs for each pier installed. The report can then be emailed directly from the machine to the engineer, builder, or owner.