LOCATION: Barnstable
COMPLETION DATE: July 2024
Our Seasonal Maintenance crew made this look like a new. The timber and Thru-Flow decking was pressure washed to remove algae and lichen. The handrails were sanded to smooth out the natural weathered grain of the wood. The pilings were crowned with Acryfin to protect & give a well finished look. The owner choose to enhance the floating dock with a pet swim ladder installed for the family dog.