info@beaconmarineco.com   |   Pay Your Bill

Pine Island – Bridge Reconstruction

LOCATION: Barnstable County

COMPLETION DATE: September 2019

PROJECT DESCRIPTION: This project consists of a completed residential bridge reconstruction project leading to a private Cape Cod Island with two homes on it. Our construction crews disconnected all utilities out to the island that ran in the existing bridge, removed the old failing bridge and its abutments at either side of the road, built two new abutments on either side and added a new higher capacity and higher elevation bridge. The bridge now has a known capacity rating and is elevated out of the storm tide range making it safer for the homes on the island.