New Pier On Oyster Harbors

Location: Osterville, MA

Project Completion: March, 2016

Details: New pile supported pier constructed using Ipe decking on the pier, ramp, float, and handrail. A custom stair set was constructed up the bank with matching Ipe decking. ThruFlow decking material was used over the area with marsh grass to allow for sunlight penetration.  The project required the removal and disposal of an existing seasonal dock and a staircase. The project was completed ahead of schedule requiring less than 2 weeks total construction time.

 

IMG_0962

IMG_0978

IMG_0967

IMG_0513

IMG_0983

IMG_0516IMG_0235IMG_0964