Bulkhead Upgrade

This project highlights a new vinyl bulkhead installation over in Cotuit. The wall is over 180’ long and made up of  ShoreGuard vinyl sheet-piling, and Chance helical tie back anchors. After the new wall was installed and all the fastening complete, the wall was backfilled with over 150 cubic yard of clean compatible fill material to re-nourish the heavily eroded embankment. All wall construction mobilization and installation had to be done by water, however, all of the new fill material was brought in from the upland side of this project and installed using a chute system. This was done to confirm there would be no further disturbance of the embankment.

Pier Enhancement

This project reflects our maintenance crew installing new IPE decking on a pier in Oyster Harbors. By using stainless steel screws to increase longevity and prevent rust, upon completion of decking, the old pier was demolished, as well as the old cross bracing. New cross bracing had been installed using a 3”x8” pressure treated lumber and galvanized hardware. This new cross bracing restricts the amount of lateral movement in the pier. Once these phases were complete, the crew installed 2 sets of TaylorMade Boat Whips. The boat whips are used to prevent boats from rubbing against the pier.