Seapuit River Dredging Project

Location: Osterville, MA

Project Completion: December, 2015

Details: Dredging of approximately 1000 CY of material from the Seapuit River in Osterville. The sandy material was used to nourish the beach and dune system adjacent to the river. All of the equipment had to be mobilized by barge. The project was completed in under 1 week. Throughout the winter months the sand was able to protect the beach from further erosion. Mechanical dredging methods were used to dig the river to -8′ MLW. See a write up on the project here: http://www.dredgingtoday.com/2016/02/12/beacon-marine-osterville-dredging-scheme-wrapped-up/